Which of the following statements are correct regarding Development during the shutdown period. (3)

Which one of the following statements is correct regarding Water control measures. (1)

Which of the following statements are correct regarding underground and on surface Workshops. (3)

Which one of the following statements is incorrect regarding Stores / Timber Yard / Fuel Depots Underground and On Surface. (1)

Any excavation, which has the potential of holing, must not be blasted at the end of the shutdown shift.

Which of the following statements are correct regarding shifts and shift clearance during the shutdown period. (3)

Proper controls must be instituted during the shutdown period in regards to Stock Piles / Waste Dumps.

Any Sewage / Refuse must be cleared before shutdown.